|


The
scope of HWTS project is the engineering, design,
procurement, transmission, construction and
commissioning of the system which consist of the
following main items :
-Origin pump station at Al-Khobar
-Main pipeline / 56” / diameter / 135 / km length
-Abqaiq branch / 16” / diameter / 8 / km length
-/ 5 / line valves stations
-Terminal facilities at Al-Hafuf and Abqaiq
-SCADA system ( hardware and software )
|